Jul 052015
 

H&WB Asia Pacific (Pte Ltd) Corp. is in talks with power distributors for the output of its 700-megawatt (MW) coal-fired power plant in Camarines Norte, due to be constructed starting in 2017, the Energy department said.

 Leave a Reply

(required)

(required)