Jul 092015
THE ENERGY Regulatory Commission (ERC) has started the review process for the adoption of a lower rate for wind power projects that will be applied in the feed-in tariff (FIT) scheme.
THE ENERGY Regulatory Commission (ERC) has started the review process for the adoption of a lower rate for wind power projects that will be applied in the feed-in tariff (FIT) scheme.