Jun 262016
 

THE Energy Regulatory Commission (ERC) will look into the process used by the Department of Energy (DoE) in arriving at the list of solar projects that it certified as eligible to receive a guaranteed rate of P8.69 for each kilowatt-hour it feeds into the national electricity grid.

 Leave a Reply

(required)

(required)