Sep 142015
 

THE AYALA and Metro Pacific groups said they took over the operations, maintenance and extension of the Light Rail Transit Line 1 (LRT-1) from Saturday, but the public will not immediately feel the improvements because the train system handed over to them is “severely deteriorated.”

 Leave a Reply

(required)

(required)