Mar 102016
 

THE DEPARTMENT of Energy (DoE) has drafted a circular that sets the “optimal utilization” of the Agus hydroelectric plants in Mindanao ahead of an expected peak in the demand for electricity during the summer months.

 Leave a Reply

(required)

(required)