Feb 102015
THE MEASURE to boost power on the Luzon grid has moved to the interpellation stage at the Senate, less than a month before the dry season starts testing the adequacy of supply.
THE MEASURE to boost power on the Luzon grid has moved to the interpellation stage at the Senate, less than a month before the dry season starts testing the adequacy of supply.