Sep 292016
 

THE Philippine Solar Power Alliance (PSPA) has asked the Department of Energy (DoE) to resolve the issue of over-subscription to the 500-megawatt (MW) installation target set under the past administration as well as persistent questions on how the developers qualified to the guaranteed feed-in-tariff (FiT), its top official said.

 Leave a Reply

(required)

(required)