Jun 182015
 

DAVAO CITY — Aboitiz Power Corp. (AboitizPower) has confirmed that subsidiary Therma South, Inc. (TSI) is now synchronizing its first 150-megawatt (MW) coal-fired power plant with the Mindanao grid, a prelude to commercial operations that could start by the end of June or early July.

 Leave a Reply

(required)

(required)