Apr 062015
 

DAVAO CITY — The commercial operation of the first 150-megawatt (MW) coal-fired power plant of Therma South, Inc. (TSI), targeted this month, could be delayed following the Mindanao-wide blackout last Sunday, for which the cause has not yet been determined.

 Leave a Reply

(required)

(required)