Apr 182017
 

POWER system operator National Grid Corp. of the Philippines (NGCP) will be building a new transmission backbone to carry added power capacity in Mindanao at a cost of P6.86 billion, details of the decision released by the Energy Regulatory Commission (ERC) show.

 Leave a Reply

(required)

(required)